[adinserter name="Header - 728 x 90"]

Slow, slow, slow

Oxbow – Asked how things are going, Trevor Spearing, of Extreme Excavating summed it up in one word: “Sucks.” He then followed up with, “Slow, slow, slow.” The Oxbow-based hydrovac company had built its fleet up to 12 trucks for…